Sewer Main Line Extension


A Sewer Main Line Extension is required when property within the District is to be served but does not currently have main line frontage - or requires additional service / system capability.

 

The extension process begins with a review process coordinated thru the Property Developer and the Southgate Engineering department.  Once blue lines have reached a substantial level of compliance, plans are then reviewed by the City of Englewood's Engineering department.

 

Initial review of drawings cannot begin until Southgate’s plan review/inspection fees have been received by the district.

 

Submittals generally consist of two full size (24” x 36”) paper sets with a Cover Page, General Notes Page, Overall Utility Plan, Sewer Plan and Profile Page, and a Details Page.  See the Sewer Review Checklist for a summary of plan expectations.

 

Approved plans and recorded easement (if required) are required before a preconstruction meeting can be held and construction can then begin.

 

Please see the below links for useful resources pertaining to the Water Main Line Extension Review Process:

 

Sewer Review Checklist

Sewer System General Notes

Sewer Details