2018 Water Replacement Project

Please excuse our mess!  Our apologies in advance for the annoyance of traffic impacts and water shut-offs!  Thank You for your patience and cooperation while we replace the waterlines to improve your neighborhood!

Project Information:

Location
South of E. Orchard Road and east of S. Holly Street
Palos Verdes Neighborhood, Centennial.  Water pipes that will be replaced are shown in blue in the image below.
Description Replacement of approximately 14,000 feet of 6-inch and 8-inch
water mains, valves, and fire hydrants
Engineer Burns & McDonnell Engineering Company, Inc.
Contractor Brannan Construction Company
Schedule Work is starting the end of April/beginning of May 2018 and will continue through September 2018.
2018 Waterline Replacement - Project Limits

Construction Phasing:

Although the project area is large and affects many streets, the contractor will work in a phased manner.  The contractor is starting at the intersection of S. Holly Street and E. Maplewood Avenue and working their way east.  They plan on working through the east/west streets first and then the north/south streets.  Schedule updates will be posted on our website throughout the duration of the project at:  http://southgatedistricts.org/240/2018-Water-Replacement-Project    

The typical events occurring during waterline replacement construction looks like:

  • Set-up traffic control for the safety of works, drivers, and pedestrians
  • Dig a trench for a section of waterline to be replaced
  • Install the new waterline
  • Backfill the trench and compact the soil
  • Test the new waterline – we test to make sure it does not leak and that it is clean
  • Fully connect the new waterline to the existing system
  • Transfer homes from the old waterline to the new waterline
  • Open the street to traffic before moving on to the next section of pipe - the contractor will likely come back to pave at a later date (in order to do a lot of the paving at once), but it will be drivable in the meantime
  • Restore disturbed areas to similar conditions as before construction

Traffic Impacts:

  • Lane closures will be required daily with approved traffic plans by City of Centennial
  • Notifications regarding “No-Parking” zones will be posted prior to construction
  • Access to driveways may be temporarily impacted when the contractor installs pipe in front of the driveway

Notifications for Residents:

  • Please check your front door for notifications during construction
  • Contractor is required to notify you before blocking your driveway
  • Contractor is required to notify you at least 24 hours in advance before planned water shut-offs to accommodate:
    • connecting a new waterline to the existing system
    • transferring a home from the old waterline to the new waterline
    • safety of workers in the trench (exposed waterlines that are not shut-off (i.e. pressurized) are unsafe for workers
  • Planned water shut-offs are typically scheduled Monday through Friday, 9 am to 5 pm
  • Sometimes the contractor runs into unforeseen circumstances that results in an unplanned water shut-off
    • Safety situations can arise or planned water shut-offs turn into an emergency situation and last longer than expected
    • If your water is out and you were not expecting it, please call us  
  • Any time water is shut-off, the contractor will work non-stop until water service is restored

Emergencies (Water Leak or Sewer Spill)

Call Southgate at 303.779.0261, option 1 during business hours and option 8 after hours to speak with a Field Operator